

Synthetic grass

Sports surfaces & safety flooring
Your Vision.Our Expertise.
What we lay


Synthetic grass


Courts & flooring


Athletics
The materials
How it gets built
Site measure, level survey, drainage assessment. You get a layout drawing, a surface specification and a bill of quantities you can tender against.
Excavation, aggregate sub-base, kerbs, drainage, concrete or bituminous bed. Most surface failures trace back to this stage.
Shockpad, turf laying and seaming, or in-situ pour and coating. Infill spread and brushed to spec, then game lines set out and cut in.
Fencing, netting, goalposts, poles, nets, seating, dugouts, LED floodlighting. Erected so the facility opens complete.
Line-marking check, snags closed, maintenance schedule handed over, and an annual brushing and top-up plan if you want us to keep it.
Who we build for
FAQ
AD Sports Infra designs, supplies and installs sports surfaces and safety flooring across India. That covers artificial football and cricket turf, synthetic athletic tracks, acrylic and polyurethane courts, cast-in-situ EPDM play areas, rubber gym flooring and modular interlocking tiles, plus the civil sub-base, fencing, netting and floodlighting around them.
We are based out of Navi Mumbai and take projects across India.
Both. We take turnkey contracts covering excavation, aggregate sub-base, drainage, kerbs and the concrete or bituminous bed, and we also supply surface materials to clients running their own civil contractor. Turnkey usually costs less overall, because sub-base defects are the most common cause of surface failure.
Cost is driven by area, sub-base condition and system, not by sport. Modular tiles and acrylic recoats sit at the lower end, 50 mm infill football turf and cushioned acrylic in the middle, full-PUR athletic tracks at the top. We quote per square foot after a site measure, itemised so you can see civil, surface and fit-out separately.
A court recoat takes about a week of dry weather. A new multi-sport court runs three to five weeks including curing, a five-a-side turf arena four to six weeks, and a full 400m athletic track eight to twelve weeks. Monsoon windows are the main scheduling constraint in India.
Try
Results show the passage the words appear in. Opening one takes you to that exact spot on the page.